
Free Facility Coatings Assessment
Know what your building needs before it becomes a problem.
A free Facility Coatings Assessment from Minturn Industrial. We walk your facility, photograph every painted, coated and marked surface, and give you a prioritized report with budget numbers you can plan around.
No cost. No obligation. Report in 5 business days.
What we inspect
Every coated surface, inside and out
Exterior walls
Tilt-up, metal panels, sealants and caulk joints
Structural steel
Columns, canopies, stairs and railings
Doors and docks
Man doors, frames, dock doors and dock areas
Bollards and safety yellow
Guardrails, bollards and safety markings
Floors and striping
Epoxy, sealed concrete, aisle and line striping
Roof coatings
Coating condition, flashing and rooftop supports
Interiors
Offices, restrooms, break rooms and wallcovering
Parking and site
Lot striping, curbs and signage posts
What you get
A report you can actually budget from
- A photo report with a Good / Watch / Act now rating for every area
- A priority list for this year, next year and 3 to 5 years out
- Budget ranges you can drop straight into your capital plan
- A recommended maintenance schedule for your building
Findings
Condition by area
- Exterior wallsGood
Coating intact, light chalking.
- Dock doors & framesWatch
Wear at contact points.
- Bollards & guardsAct now
Safety yellow faded, chipped.
- Interior steelWatch
Rust starting at column bases.
- Floor markingsAct now
Aisle lines worn through.
- Office interiorsGood
Scuffing in corridors.
Priority plan
What to do, and when
- This year$$
Re-stripe aisles · repaint bollards
- Next year$$
Dock frames · column bases
- 3–5 years$$$
Exterior wall repaint
Your report shows budget ranges for each item — planning numbers, not a quote.
Example pages. Your report covers your building.
How it works
Three simple steps
- STEP 01
Request
Tell us about your building. It takes about a minute.
- STEP 02
Walk
We schedule a visit around your operations. Usually 1 to 3 hours on site, with no disruption to tenants or production.
- STEP 03
Report
Within 5 business days, we walk you through the findings. You decide what, if anything, comes next.
Who it's for
Built for the people who keep buildings running
Property managers, facility and maintenance managers, plant managers, and owners of warehouses, distribution centers, manufacturing and food facilities, office buildings, churches and schools.
Why Minturn
Why facility teams choose Minturn
- Four generations of painters and 20 years in the trade
- Commercial and industrial specialists in coatings, floors, roofs and wallcovering
- OSHA 30 leadership and a documented safety and health program
- Nationwide coverage across the Midwest, South, East Coast and Texas
- One point of contact from first walk to final punch
Preventative maintenance
After the assessment: keep it that way
Many clients turn their report into a preventative maintenance plan: scheduled inspections and touch-ups that catch small issues before they become capital projects. Your assessment shows exactly what a plan would cover for your building.
Proof
Recent work

Active industrial park — full exterior repaint
Full facility exterior

Class A warehouse park — two-facility exterior repaint
Full exterior — two facilities

Forklift charging station — epoxy floor and line striping
Charging station footprint
FAQ
Common questions
Request
Know your building's needs before the next budget cycle.
Tell us about your facility and we'll reach out within one business day to schedule your walk.
Tel · (614) 953-6171