Flag refreshes, full-property wallcovering programs, and select-service rebrands. We work under the GC's interiors schedule, take floors as drywall finish releases, and turn keys over to FF&E install on a rolling basis.

What this sector requires
- Floor-by-floor release coordination with GC and FF&E
- Skim-coat prep that protects the manufacturer warranty
- Brand-standard color and pattern matching across substrates
- First-walk punch close on occupied turnover
Systems we install for hospitality
- Type II commercial vinyl (15 – 22 oz)
- Digital print and custom mural wallcoverings
- Acoustical and textile wallcoverings
- Interior latex for guestroom and corridor repaints
How we work in occupied hospitality facilities
- 01Coordinate floor-by-floor release with GC and FF&E
- 02Skim-coat to Level 5 at all wallcovering elevations
- 03Wallcovering primer, layout, plumb
- 04Hang per NGPP Standard Practice CW-101
- 05Seam QC, trim out, punch walk by floor
§ 05 — Engage
Mobilize a crew to your facility.
Scope walks within 72 hours of inquiry. Phased schedules built around continuous operations.