Sectors / hospitality

Hospitality

Flag refreshes, full-property wallcovering programs, and select-service rebrands. We work under the GC's interiors schedule, take floors as drywall finish releases, and turn keys over to FF&E install on a rolling basis.

Hospitality sector reference photo

What this sector requires


  • Floor-by-floor release coordination with GC and FF&E
  • Skim-coat prep that protects the manufacturer warranty
  • Brand-standard color and pattern matching across substrates
  • First-walk punch close on occupied turnover

Systems we install for hospitality


  • Type II commercial vinyl (15 – 22 oz)
  • Digital print and custom mural wallcoverings
  • Acoustical and textile wallcoverings
  • Interior latex for guestroom and corridor repaints

How we work in occupied hospitality facilities


  1. 01Coordinate floor-by-floor release with GC and FF&E
  2. 02Skim-coat to Level 5 at all wallcovering elevations
  3. 03Wallcovering primer, layout, plumb
  4. 04Hang per NGPP Standard Practice CW-101
  5. 05Seam QC, trim out, punch walk by floor

§ 05 — Engage

Mobilize a crew to your facility.

Scope walks within 72 hours of inquiry. Phased schedules built around continuous operations.

Request a scope walk