Projects / MIN-2025-0308
Sector — Hospitality
Select-service hotel — full property wallcovering
Hung 112 guestrooms, all corridors, and the lobby for a national flag refresh — turnover-ready by floor.

- 112
- Keys hung
- 9wk
- Schedule
- 97%
- First-walk pass
- 0
- Days off GC schedule
Narrative
Worked under the GC's interiors schedule, taking floors as drywall finish was complete and releasing them to FF&E install on a rolling basis.
Skim-coat prep on every wall to protect the manufacturer warranty. Custom-printed accent walls in the lobby pattern-matched across three substrates.
Punch list closed on first walk for 109 of 112 keys.
Sequence
- 01Coordinate floor-by-floor release with GC and FF&E
- 02Skim coat to Level 5 at all wallcovering elevations
- 03Wallcovering primer, layout, plumb
- 04Hang per NGPP CW-101 — corridors first, then guestrooms
- 05Seam QC, trim out, punch walk by floor