Projects / MIN-2024-0411
Sector — Distribution
Regional distribution center — urethane cement floor
Replaced failing epoxy with thermal-shock-rated urethane cement across the entire pick aisle and staging zone.

- 186k sf
- Floor coated
- 21
- Overnight phases
- 1/4"
- System build
- 10yr
- System warranty
Narrative
Existing 4-year-old epoxy had delaminated under repeated washdown and forklift abuse. Owner needed a system rated for 180°F thermal cycling and aggressive cleaning chemistry.
Worked third-shift only, eight hours per night, twenty-one consecutive nights. Aisles returned to service for first-shift each morning.
Sequence
- 01Shot-blast to ICRI CSP 5
- 02Crack chase and joint repair
- 03Urethane cement body coat at 1/4"
- 04Aluminum oxide broadcast for slip resistance
- 05Polyaspartic seal coat for cleanability
§ 05 — Engage
Mobilize a crew to your facility.
Scope walks within 72 hours of inquiry. Phased schedules built around continuous operations.