Hilliard flex industrial buildout

Projects / MIN-2026-0304 — Commercial Interiors / TI

Hilliard flex industrial buildout

New flex-building buildout finished end to end — high-bay warehouse walls and structure, plus a front office suite of lobby, corridors, glass-front offices, and a two-tone break room.

Hilliard flex industrial buildout
2
Finish standards
4wk
Schedule
0
Schedule days lost
100%
First-walk pass

Narrative


One shell, two finish standards. The warehouse half had to read bright and uniform under new racking and lighting; the office half had to hand over as leasable Class-A space.

Deck, joists, and hanging services were sprayed with dryfall so overspray fell dry to a swept slab. Perimeter walls were filled and coated to a washable finish, coordinated around racking installation and MEP rough-in.

In the office, walls were patched, skimmed, and sanded to a uniform Level 4 before priming. Corridors, glass-front office fronts, and hollow-metal frames were finished direct-to-metal, with a two-tone accent carried through the break room to the tenant's palette.

Sequence


  1. 01Protect slab, racking, storefront glazing, and finished flooring
  2. 02Spray deck, joists, and structure with dryfall from lifts
  3. 03Block-fill and coat warehouse perimeter walls to a washable finish
  4. 04Office: patch, skim, sand to Level 4, prime, and two-coat walls and accents
  5. 05DTM doors, frames, and office fronts; zone punch and turnover

Field record


Office lobby with storefront glazing and finished walls
Office corridor with coated walls and dark hollow-metal frames
Run of glass-front private offices after finishing
Break room with two-tone accent wall and casework