Hilliard flex space buildout

Projects / MIN-2026-0402 — Commercial Interiors / TI

Hilliard flex space buildout

Flex building fit-out — white-finished high-bay warehouse with sprayed structure, plus a Class-A office suite with storefront entry, navy accent wall, and finished break area.

Hilliard flex space buildout
2
Finish standards on one job
0
Schedule days lost
100%
First-walk pass
3
Coating systems

Narrative


The high bay was sprayed before racking and door hardware set — dryfall over deck, joists, and hangers, tilt walls rolled out to a clean uniform white so the space reads bright end to end.

On the office side, walls were brought to Level 4 and finished in a low-sheen washable acrylic. A single navy accent wall carries the tenant's brand into the open work area against otherwise neutral field walls.

Storefront, hollow-metal frames, safety bollards, and misc. metals were finished direct-to-metal. Work was sequenced against shell completion so flooring and ceiling trades never waited on paint.

Sequence


  1. 01Mask storefront, overhead doors, and installed MEP
  2. 02Dryfall spray to deck, joists, and hangers
  3. 03Roll tilt-up walls to uniform white
  4. 04Patch, skim, and sand office walls to Level 4
  5. 05Prime and two-coat office field walls; navy accent wall
  6. 06DTM frames, bollards, and misc. metals; punch and turnover

Field record


Open office with navy brand accent wall and neutral field walls
Storefront entry and corridor with finished walls and hollow-metal doors
Break area with casework, tile backsplash, and washable finish