Projects / MIN-2023-1109
Sector — Manufacturing
Tier-1 supplier — high-bay structural steel recoat
Containment-bagged structural steel recoat in an active stamping plant.

- 94k sf
- Steel recoated
- 12mil
- Total DFT
- 0
- Production hours lost
- 7yr
- System warranty
Narrative
Press lines ran continuously below the work platform. Full negative-air containment with HEPA exhaust prevented overspray and dust migration.
DFT readings logged per panel; report delivered to owner at closeout.
Sequence
- 01Negative-air containment with HEPA exhaust
- 02Power-tool clean to SSPC-SP 3
- 03Stripe coat at all welds and bolt heads
- 04Full coat by airless spray, back-roll where required
- 05DFT verification per SSPC-PA 2
§ 05 — Engage
Mobilize a crew to your facility.
Scope walks within 72 hours of inquiry. Phased schedules built around continuous operations.