Tier-1 supplier — high-bay structural steel recoat

Containment-bagged structural steel recoat in an active stamping plant.

Tier-1 supplier — high-bay structural steel recoat
94k sf
Steel recoated
12mil
Total DFT
0
Production hours lost
7yr
System warranty

Narrative


Press lines ran continuously below the work platform. Full negative-air containment with HEPA exhaust prevented overspray and dust migration.

DFT readings logged per panel; report delivered to owner at closeout.

Sequence


  1. 01Negative-air containment with HEPA exhaust
  2. 02Power-tool clean to SSPC-SP 3
  3. 03Stripe coat at all welds and bolt heads
  4. 04Full coat by airless spray, back-roll where required
  5. 05DFT verification per SSPC-PA 2