Sectors / higher-ed
Higher Ed
Universities have hard calendar windows — between semesters, summer turn, and the off-season for athletics. We plan around them and finish on the first day classes return.

What this sector requires
- Hard calendar windows — finish before students return
- Pedestrian deck membranes and stadium concourses
- Dorm summer turn at scale — multiple buildings simultaneously
- Coordination with FM, athletics, and student-life schedules
Systems we install for higher ed
- Traffic-bearing urethane deck membranes
- Aliphatic topcoats for UV-exposed concourses
- Interior latex for dorm and classroom repaints
- DTM acrylic on rails, frames, and exterior steel
How we work in occupied higher ed facilities
- 01Calendar lock with FM and athletics; selective demo and survey
- 02Substrate repair and crack chase
- 03Primer, base, intermediate, topcoat
- 04Aggregate broadcast in pedestrian zones
- 05Phased return to service before window closes
§ 05 — Engage
Mobilize a crew to your facility.
Scope walks within 72 hours of inquiry. Phased schedules built around continuous operations.