Sectors / higher-ed

Higher Ed

Universities have hard calendar windows — between semesters, summer turn, and the off-season for athletics. We plan around them and finish on the first day classes return.

Higher Ed sector reference photo

What this sector requires


  • Hard calendar windows — finish before students return
  • Pedestrian deck membranes and stadium concourses
  • Dorm summer turn at scale — multiple buildings simultaneously
  • Coordination with FM, athletics, and student-life schedules

Systems we install for higher ed


  • Traffic-bearing urethane deck membranes
  • Aliphatic topcoats for UV-exposed concourses
  • Interior latex for dorm and classroom repaints
  • DTM acrylic on rails, frames, and exterior steel

How we work in occupied higher ed facilities


  1. 01Calendar lock with FM and athletics; selective demo and survey
  2. 02Substrate repair and crack chase
  3. 03Primer, base, intermediate, topcoat
  4. 04Aggregate broadcast in pedestrian zones
  5. 05Phased return to service before window closes

§ 05 — Engage

Mobilize a crew to your facility.

Scope walks within 72 hours of inquiry. Phased schedules built around continuous operations.

Request a scope walk